Skip to content
5 Star Home Improvements, home

Interior Renovations in Cedar Hill, DeSoto and DFW

The part of a renovation most people never see. New walls framed square, ceilings opened and rebuilt, and everything roughed in before it's closed up.

The photos on this page are from 5 Star interior jobs, taken before the drywall went up. They show the work that decides whether a renovation lasts: framing that's plumb, ceilings with new joists and blocking, drain lines and water lines in the right place, and electrical boxes set where the room needs them.

Whether you're moving a wall, opening a doorway, fixing a sagging ceiling or rebuilding after a leak, it starts the same way. Show us the space and tell us what you want changed.

We take on interior work for homeowners in Cedar Hill, DeSoto and the Dallas–Fort Worth area.

From our jobs

A long run of new wall studs with blue electrical boxes mounted
New walls framed, boxes set
Opened ceiling showing new joists, a beam and electrical cable
Ceiling opened, joists and wiring
Room with a newly framed wall opening and fresh wiring run for switches
Framed opening, wiring run
Framed wall with new PVC drain lines running down to the floor
New drain lines in the wall
Looking up into an opened ceiling at new beams and blocking
Beams and blocking overhead
Bare subfloor with new drain openings cut between framed walls
Subfloor and drain openings

Common questions

Can you open up or move a wall?
Send photos of both sides of the wall and the ceiling above it. We'll look at what's in the wall and tell you what it takes.
Do you handle the plumbing and electrical when walls are open?
Yes. Plumbing and electrical rough-in happen while the walls are open. Tell us what you need moved or added.